Treatment plant connected to the Zohr offshore field, which is considered the biggest natural gas reserve of the Mediterranean. After its start-up, Egypt will become self-sufficient from the energy point of view.
Proger is currently collaborating with reservoir operators for pre-commissioning and commissioning activities of the onshore gas treatment plant in Port Said and for the supply for data engineering and strategic planning services for the maintenance of the entire onshore-offshore complex.
Eni Progetti / Belayim Petroleum Company (Petrobel) / Petrojet
Engineering. Assistance activity to commissioning. Preliminary verifications and tests. Operating tests. Data engineering. Definition of maintenance strategies. Commissioning activity support.
Port Said, Egypt
Zohr, current production: 2.000.000.000 ft3/day
Port Said facility, area: 1.000.000 m2