Electrical connection of wells BRW M6 with a 30 kV overhead line. One power line air 60/30 kV between BRN and ZEA ROM, two overhead power lines between the branch and IFM5 to M7 – North Hub ROM and connection to wells Study for the detection of the content of harmonics in the electrical system ROM.
GSA (Groupment SONATRACH – AGIP)
Engineering. Specialist Consultancy.
Algeria
Air Power Line: 60/30kV
Power Substation: 60/30/5.5/0.4 kV