This project involved the doubling of 10.4 km of the Bari-Taranto rail line between Bari Sant’Andrea and Bitetto. Two kilometres of the new line run in an artificial tunnel and 320 m atop a viaduct. The intervention includes 2 new rail stations with service buildings and all technological systems along the line.
Salvatore Matarrese – Fersalento – Eredi Giuseppe Mercuri – F.lli Manes Srl
Engineering.
Italy
Speed: 200 km/h
Tunnels total length: 2,000 m
Tunnels: 15