it
it

Environmental remediation of Assemini: two plants by Proger

Together with Eni Rewind for the remediation of the industrial site near Cagliari

Proger is working on two projects for the remediation of the soil and the aquifer at the Eni Rewind site in Assemini: an AS / SVE (Air Sparging and Soil Vapor Extraction) plant and an MPE (Multi Phase Extraction) plant.

In recent months, the JV made up of Proger, Ecotherm and Sicilsaldo has been awarded two contracts with Eni Rewind as part of the important environmental remediation and naturalistic enhancement program of the Assemini complex, about 2040 ha included in the site of national interest Sulcis Inglesiente Guspinese.

The subject of the contracts relating to the construction of the AS / EVS systems, in the area called Area Impianti, and MPE, in the Is Campus area, is the execution of the complementary process engineering; detailed engineering; procurement and procurement services; the supply of materials and equipment; construction and assembly work; pre-commissioning; supervision of assembly and technical assistance services, if requested by the client, during commissioning and start-up of the plants.

These projects are just the latest in Proger’s long-lasting and fruitful collaboration with Eni in an extremely delicate and highly responsible sector such as that of environmental remediation.