Proger, together with Technital and Duomi, is part of the group of designers indicated by the JV led by Fincosit which was awarded the integrated contract for the executive design and execution of the works relating to the construction of the new drop for shipbuilding use within the Porto Petroli of Genoa Sestri Ponente and hydraulic arrangement of the Molinassi stream – Lot 2 – II Section – Phase 1.
The project aims to create a new industrial platform – which will make it possible to improve and rationalize the logistics of shipbuilding areas – and the hydraulic diversion and arrangement of the Rio Molinassi terminal section.