The new Ribarici, Cicevac and Morava hydroelectric power plants feature new weirs along the Ibar River and a series of flap gates with Kaplan turbines along the Morava River. Together the new facilities will generate a total output of 105.4 MW with net hydraulic level changes from 3.6 to 10 meters.
Sistema Rinova D.O.O.
Engineering.
Serbia
N.3 Plants in Cicevac 16,2 MW
N.5 Plants in Ribarici 10 MW
N.12 Plants in Morava west 79,2 MW
Total Power 105,4 MW