This new interurban bypass road in southern Bergamo is 6 km long and is composed of two separate carriageways, each with two traffic lanes . The intervention includes 6 different bridges, a 500 meter long artificial tunnel, 6 new junctions and new secondary roads.
Cavalleri Ottavio s.p.a.
Engineering.
Italy
Total Length: 6,000 m
6 Bridges
500 meter Long Artificial Tunnel